Arıcı, E.
Ecem Arıcı is the Process Chief Engineer at Tüpraş’ İzmit refinery. She is responsible for the kerosene treatment unit, the SHU and the LPG merox unit. She previously worked as an operations engineer and as a process engineer for the DCU. She earned a BSc degree in chemical engineering from Boğaziçi University in Turkey.
Debottleneck analysis on a coker debutanizer via simulation models
Environment & Safety
/ Maintenance & Reliability
/ Process Optimization
/ Refining
/ Boilers
/ Carbon Management
/ Economics
/ Engineering & Design
/ Equipment
/ Naphtha
/ Products
/ Utilities
/ Valves
/ Europe
Production requirements for more valuable refined products and/or increased refining flexibility are increasing due to new regulations.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- OXEA confirms final investment decision for major capacity expansion at plant 7/10
- TotalEnergies ships to Asia the first cargo produced by the ECA LNG plant 7/10
- ADNOC L&S expands LNG fleet with order for four new carriers 7/10
- India's ONGC plans to build 13-MMbbl national strategic oil reserve 7/10
- Russian refineries, oil terminal, tankers hit, Ukraine says 7/10
- Tajikistan says it has 60 days' fuel in reserve amid Russian supply crunch 7/10
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

