February 2022
Plant Design, Engineering, Construction and Commissioning
Piping interface type selection
Most oil and gas process plant projects involve multiple work packages executed by different lump sum turnkey (LSTK) contractors executing work within their own package, with a final piping interface connection at an agreed boundary limit to accomplish the interface joint between two parties and successfully close the piping interface.
This is a preview of our premium content. Thank you for your interest—please log in or subscribe to read the full article.
The Authors
Related Articles
- Best practices to achieve highest integrity isolation for black powder-generated gas processes
- Innovative grassroots CDU-VDU configuration: Pioneering energy efficiency and net-zero pathways in modern refineries
- Improving isolation valve reliability in delayed coker units: Field experience-driven design enhancements


Comments