December 2023
Special Focus: Plant Design, Engineering, Construction and Commissioning
Are resources and capacity the same?
If you are involved in the delivery of capital projects, there is a good chance that you may have heard, or even used, expressions such as, “We have a resource-loaded schedule,” “We are behind schedule, so let’s add more resources,” or “We need to increase our capacity.”
This is a preview of our premium content. Thank you for your interest—please log in or subscribe to read the full article.
The Author
Related Articles
- New alternatives for severe service urea letdown valve applications
- Causes and countermeasures for a compressor lube oil system failure due to delayed oil pressure recovery by an auxiliary lube oil pump
- Application of systems engineering principles in a reliability assessment of air-cooled heat exchangers
Comments