March 2024
Environment and Safety
An ignition control nightmare—Protecting assets from a lightning strike
Design engineers put forth their best efforts to forecast all risks for their processing plant and strive to embed optimum controls in design, commissioning, operations and maintenance to prevent these risks during the plant’s lifecycle.
This is a preview of our premium content. Thank you for your interest—please log in or subscribe to read the full article.
The Author
Related Articles
- From compliance to safe operations: Why relief systems design documentation matters in LNG facilities
- Process instrumentation and data analytics merge, powering optimization
- Integrate people into process safety: The complete framework for operator actions and interventions in functional safety—Part 1


Comments