Environment & Safety
Editorial Comment: Where some see roadblocks, we see opportunities
In the January issue of Hydrocarbon Processing, the editorial comment focused on the roadmap to advancing ideas.
Business Trends: How plastics waste recycling could transform the chemical industry
If plastics demand follows its current trajectory, global plastics-waste volumes would grow from 260 MMtpy in 2016 to 460 MMtpy by 2030, taking what is already a serious environmental problem to a new level.
A cost-effective approach to monitoring dangerous hydrogen sulfide gas
Hydrogen sulfide gas (H2S) is one of the most common hazards in the oil and gas industry.
Comparative analyses of common project execution alternatives
With major projects (FIG. 1), alternatives are generally considered in overall project execution and in construction.
Coke drum and blowdown system overpressure protection design - Part 1
The blowdown (BD) system in delayed coking units (DCUs) receives waste streams generated during the coke drum (CD) decoking process to recover valuable hydrocarbons and water. In recent DCU designs, the CD pressure relief valves (PRVs) also discharge to this system and then to the flare system via the BD PRVs.
FCC operational changes to boost gasoline octane
The fluid catalytic cracking unit (FCCU) is one of the main units providing gasoline with high-octane numbers to the refinery gasoline pool.
Ultra-deep desulfurization of FCC gasoline: Reactive adsorption strategy
With an increase in concern for the environment, countries around the world are implementing stringent environmental regulations and are continuously pressuring refiners to reduce the amount of sulfur in transportation fuels—primarily gasoline and diesel—to combat airborne pollution caused by vehicles.
Digital: Digitalization—Why now?
The process industries are under threat.
Petrochemicals: Which network can fulfil the petrochemical sector’s desire to exploit Industry 4.0?
The global petrochemical industry has not been short of success.
Fabrication of clad equipment and piping—Part 2
For pressure vessels, heat exchangers and piping in corrosive services, the materials in contact with the process are often required to be high alloys to provide a reliable service life.
- OXEA confirms final investment decision for major capacity expansion at plant 7/10
- TotalEnergies ships to Asia the first cargo produced by the ECA LNG plant 7/10
- ADNOC L&S expands LNG fleet with order for four new carriers 7/10
- India's ONGC plans to build 13-MMbbl national strategic oil reserve 7/10
- Russian refineries, oil terminal, tankers hit, Ukraine says 7/10
- Tajikistan says it has 60 days' fuel in reserve amid Russian supply crunch 7/10

