Equipment
Marathon overhauling Galveston Bay refinery, FCCU
The 140,000-bpd FCC-3 is scheduled to be shut for up to eight weeks for the overhaul, the sources said.
Digital Exclusive—Valve maintenance: An open and shut case?
Maintaining valves throughout a plant’s lifetime helps to preserve optimal performance, minimize supply disruptions and reduce environmental impacts; however, it can be challenging. Remote locations, extreme operating conditions and the often-aggressive properties of the fluids being transported can pose specific servicing and maintenance challenges.
Verdant Specialty Solutions completes acquisition of Lubrizol’s Elmendorf, Texas (U.S.) manufacturing and R&D assets
The Elmendorf acquisition significantly strengthens Verdant’s position in the oil and gas production chemicals market, expanding its technology offering with the addition of H₂S scavengers, scale inhibitors, corrosion inhibitors, and other specialty oilfield chemicals.
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- OXEA confirms final investment decision for major capacity expansion at plant 7/10
- TotalEnergies ships to Asia the first cargo produced by the ECA LNG plant 7/10
- ADNOC L&S expands LNG fleet with order for four new carriers 7/10
- India's ONGC plans to build 13-MMbbl national strategic oil reserve 7/10
- Russian refineries, oil terminal, tankers hit, Ukraine says 7/10
- Tajikistan says it has 60 days' fuel in reserve amid Russian supply crunch 7/10
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

