Environment & Safety Gas Processing/LNG Maintenance & Reliability Petrochemicals Process Control Process Optimization Project Management Refining

Process Optimization

Toyo lands utilities work at Brazil refinery project

A consortium led by Toyo Engineering Corp. has been awarded a contract from Petrobras for utilities construction to be installed in the Comperj refinery project in Itaborai, Rio de Janeiro, Brazil. The project is scheduled to be completed in 2014.

Select optimal schemes for gas processing plants

Energy Industries Engineering and Design Consultant Company (EIED): Khorsand Movaghar, M.  |  Maleki, M.

With careful analysis, meet product requirements and environmental standards

Improve process control for natural gas heat exchangers

Jacobs Canada Inc.: Lai, H-M.

Simulation model shows how to optimize plant controllability and safety

Case history: Replacement of existing pressure vessel

Fluor Canada Ltd.: Fearn, D.  |  McKay, J.

Installing new equipment involves more processes to ensure safety and to meet new codes

Are you losing money when tuning controllers?

Whitehouse Consulting: King, M. J.

Here are 10 rules, if followed, that will result in poor process performance

Case 66: Fiberglass mixing tank flexing vibration

Consulting Engineer: Sofronas, A.

The design of fiberglass and polymer tanks had many problems in the 1980s. Most of these problems were resolved with experience, new materials and manufacturing techniques, along with new national con..

HP Insight: Global HPI: 90+ years old and still going strong

In 2012, Hydrocarbon Processing (HP) will celebrate its 90th anniversary as a publication for the professionals involved in the daily activities of the global hydrocarbon processing industry (HPI). Mu..

HP Integration Strategies: Inline blending can help process plants cut costs and reduce quality give-away

ARC Advisory Group: Crisafulli, K.

In a traditional batch-blending process, the final product composition is created by combining different intermediate products (held in storage tanks) in a blend tank. The objective is to create final..

HP Reliability: Dealing with asset management and life extension

Hydrocarbon Processing Staff: Bloch, Heinz P.

The business manager for an asset management solutions (AMS) firm in the Middle East faced a big task. He had been asked to execute a major project for an oil and gas producer and wanted to have his q..

HP Construction: North America

Hydrocarbon Processing Staff: Meche, Helen

BioAmber and Mitsui & Co. have partnered to build and operate a manufacturing facility in Sarnia, Ontario, Canada. The initial phase of the facility is expected to produce 17,000 metric tons of biosuc..