Environment & Safety Gas Processing/LNG Maintenance & Reliability Petrochemicals Process Control Process Optimization Project Management Refining

Process Optimization

Explicit friction factor correlations for turbulent fluid flow in noncircular ducts and polymeric fluids

Bayer HealthCare: Goudar, C. T.
University of Oklahoma Health Sciences Center: Sonnad, J. R.

New equation provides highly accurate estimates

New explicit friction factor equation for turbulent flow in rough pipes

Bouali Sina Petrochemical Company: Sasan-Amiri, A.

It is more reliable and accurate than existing equations

Facility siting—balancing risk vs. cost

Brad Adams Walker Architecture, P.C.: Walker, B. A.

Companies should take a second look at identifying and analyzing hazards associated with temporary buildings

HP Water Management: Got risk? Cut costs safely

MarTech Systems, Inc.: Huchler, L. A.

In this environment of cost cutting, plant personnel are reviewing ALL expenses including water treatment. Operations personnel often target water treatment costs for reductions for two reasons: 1) th..

Consider practical conditions for vacuum unit modeling

Esfahan Oil Refining Co.: Yahyaabadi, R.

A good simulation model is a tool that reveals critical operating conditions and can be applied to daily operations

HP Water Management: Cost-cutting in water utilities

MarTech Systems, Inc.: Huchler, L. A.

The decline in the price for crude and finished products, especially transportation fuels, has reduced profitability for many refiners. In response to the harsh economic environment, many refineries h..

Laser-scanning technology improves plant quality, safety and training

Quantapoint: Hoffman, E.

Costs can be reduced due to 75% fewer field trips as well as 50% fewer fit-up welds and field changes

Project execution risk management for addressing constructability

International Construction Consulting LLC: Lamberson, G.
Consultant: Mokhatab, S.
David Wood & Associates: Wood, D. A.

Use construction knowledge, experience and efficiency in a structured and systematic way throughout the design and execution planning stages

Understanding basic project management

Consulting Engineer: Choi, D. W.

Practice the four basic elements to ensure a successful outcome

Consider water reuse options for your facility

PETRONAS: Amminudin, K. A.  |  Hawari, H.  |  Sofian, M. N.
Universiti Teknologi PETRONAS: Buang, A.  |  Khamaruddin, P. N. F. M.  |  Putra, Z. A.

This major company identified cost-effective and practical water minimization and regeneration opportunities for a petrochemical facility