Environment & Safety Gas Processing/LNG Maintenance & Reliability Petrochemicals Process Control Process Optimization Project Management Refining

Asia/Pacific

Foster Wheeler to consult on China carbon capture, transportation program

The World Bank has launched an analytical and advisory assistance program in China in order to build the country’s understanding of, and capacity for, application of carbon capture and storage (CCS). Foster Wheeler’s scope of work is expected to be completed in June 2013.

Indonesia approves expansion of BP LNG project

The plan calls for building a third liquefaction train at Tangguh, located in far eastern West Papua province, at an estimated cost of $12 billion. The third train would add liquefaction capacity of 3.8 million metric tpy to Tangguh, bringing total capacity to 11.4 million tons, the company said.

JX Nippon to permanently end crude processing at Japan's Muroran refinery

JX said it will keep oil tanks in the site and transport refined products from elsewhere to Muroran to ensure adequate supply. JX will also maintain some secondary units to produce petrochemical products - mainly toluene and xylene - to be used as feedstock for a paraxylene joint venture in South Korea.

Relief valve and flare action items: What plant engineers should know

Smith & Burgess LLC: D. Smith
Smith and Burgess LLC: Burgess, J.

This article can help the plant engineer review the concerns developed by the design engineer. Implementing field modifications without performing such a review is costly and exposes a facility to unjustified risks.

Surviving and thriving in era of enhanced OSHA PSM audits

SSOE Group: Reese, C.
Midland Engineering: Taylor, B.

The US agency is developing special emphasis programs to target specific industries, notably refining and chemicals, with owners facing rigid inspections and stiffer fines.

Update on the greenhouse gas regulation by the US EPA

URS Corp.: Crum, R.  |  Broberg, B.

The US Environmental Protection Agency (EPA) began regulating the emissions of greenhouse gases (GHGs) on January 2, 2011. Its long-awaited GHG controls guidance document, PSD and Title V Permitting G..

Consider new technologies to raise diesel yield in bottom-of-barrel products

Axens: Morel, F.  |  Duddy, J.  |  Wisdom, L.

The debate continues over adding a new delayed coker vs. a residue hydrocracker upstream of an existing delayed coker.

Low-pressure absorption of CO2 from flue gas: Plant economics with incentives

Politecnico di Milano: Tellini, M.  |  Manenti, F.

The precedent to this article, published in the April 2011 issue of Hydrocarbon Processing, discussed the chemical feasibility and process engineering design to absorb carbon dioxide (CO2) from flue g..

Improve integration opportunities for aromatics units—Part 1

Fluor Enterprises, Inc.: Vaidyanathan, S.  |  Zhou, J.
Apex PetroConsultants: Kapur, S.

An aromatics complex is a combination of processing units that can be used to convert petroleum naphtha and pyrolysis gasoline (pygas) into the basic petrochemical intermediates: benzene, toluene and ..

HP Reliability: Closed-oil-mist systems and maintenance cost avoidance

Hydrocarbon Processing Staff: Bloch, Heinz P.

A recent Hydrocarbon Processing (HP) article conveyed an industry finding that dates back several decades: Oil mist successfully lubricates operating machinery, protects and preserves standby equipmen..