Environment & Safety Gas Processing/LNG Maintenance & Reliability Petrochemicals Process Control Process Optimization Project Management Refining

Construction

KBR lands construction deal to expand Canadian gas processing plant

KBR will execute construction and related site support for the expansion of the Dawson Creek facility, increasing the existing capacity to 100 million standard cubic feet/day. The award follows KBR’s recent work for delivering pipe-rack fabrication and module assembly for phase one of the expansion.

Chemtex awarded loan guarantee from US to build cellulosic ethanol refinery

Once operational, the facility is expected to convert 600,000 tpy of energy grasses into an estimated 20 million gallons of cellulosic ethanol using a proprietary enzymatic hydrolysis process. The plant will produce biofuels for eastern transportation markets using non-food biomass feedstocks.

Evonik begins building German polybutadiene plant, plans mid-2013 startup

The plant is scheduled for completion in the middle of 2013. Functionalized polybutadienes, which Evonik plans to market under the name POLYVEST HT, are used mainly in sealing compounds for insulated glass windows and for adhesives used in the automotive and electronics industries.

CB&I wins work on BASF Belgium butadiene project

This award, valued in excess of $50 million, builds on CB&I’s existing relationship with BASF as licensor of its butadiene technology, according to the companies. The plant is scheduled to start up during 2014.

Utility piping: Why over-engineering is inefficient

Victaulic: Wilkerson, G.

Grooved mechanical piping can offer improved constructability, speedy expansion, retrofit and turnaround, and also reduce safety risks. It is a quality pipe-joining method.

Consider new developments for variable-speed electric motors

WorleyParsons Services: Almasi, A.

New challenges, recent developments, the latest mechanical issues and main reliability factors for large variable-speed electric motor drivers in HPI plants are presented here.

Improve performance monitoring of your turbomachinery

Canadian Natural Resources Ltd.: Bhachu, U.  |  Francis, J.

This case study documents the performance variables to consider and apply when monitoring and tracking the efficiency deterioration for a steam turbine using DSs in a PI process book.

Case history: Improve refrigeration compressor performance

Fluor Canada Ltd.: Ghaisas, N.

This case examines the mechanical distress and performance deterioration of a critical refrigeration compressor that was installed at a world-scale petrochemicals complex.

PERU LNG: Executing Peru’s largest industrial project

Hunt Oil Co.: Sharma, S.
CB&I: Hill, D.  |  Rano, P.  |  Humphrey, G.  |  Mayer, M.

The PERU LNG project includes a liquefaction plant, marine export facilities with an island breakwater, and a 408-km pipeline that connects to an existing pipeline in the Ayacucho mountains. Hunt Oil Co. is the operator.

HP Insight: How long is an economic cycle for the HPI?

Hydrocarbon Processing Staff: Romanow, Stephany

As summer takes hold in the Northern Hemisphere, demand for energy in various forms increases. In looking back over the past 90 years, energy demand and pricing cycle through high and low points. In 2..