Engineering & Design
GDF SUEZ tabs Foster Wheeler for Cameroon LNG project
Foster Wheeler AG’s Global Engineering and Construction Group has a contract with GDF SUEZ to carry out the pre-front-end engineering design (pre-FEED) for the development of an onshore LNG plant and offshore gas gathering infrastructure.
Materials market update: Opportunities in a challenging economy
As companies emerge from the downturn, new capital project models will be vital
Dynamic simulation of liquefied natural gas processes
Here’s how to improve the process design and operation of your facility
Liquefied natural gas terminal with low environmental impact
Implement these steps to mitigate performance risks
Finetune boil-off gas generation from refrigerated storage facilities
Improved estimation methods accurately calculate vaporized product for LNG and LPG storage and transfer systems
Discover new trends in oily wastewater reclamation
Refiners can find profits by ‘upgrading’ treatment and recycling process water
Automation improves asset reliability for refiners
Several case studies illustrate how automating boiler systems can yield tremendous improvement in equipment uptime and lower total operating costs
Case 57: Troubleshooting the cause of sudden impacts
Finding the cause can be elusive but calculations help
HP Control: Continuous improvement or core-competency?
In the past decade or two, the concepts of key performance indicators (KPIs), continuous improvement, core-competency and best practices have received a lot of attention. What are the relationships be..
HP Reliability: Not ready for 29-year-old pump packing
In 2009 we were informed about “a nuclear plant that was never commissioned after its original construction. This plant has been sitting idle for 29 years and is only now starting up.” The o..
- India's Reliance gets one-month US concession to buy Rosneft oil 12/24
- SOCAR signs deal to buy Gama Enerji gas plant in Turkey for $225 MM 12/24
- Japan's Eneos leads bids for Chevron’s Singapore oil refinery stake 12/24
- Larsen & Toubro awarded EPCC contract for BPCL's polyethylene plant 12/24
- Maire's Nextchem to acquire technology licensor and engineering company Ballestra 12/24
- bp agrees to sell a 65% shareholding in Castrol to Stonepeak at an enterprise value of $10 billion 12/24

