Equipment
Update: Russia’s capacity and modernization program
Since 2008, Russian regulations regarding the crude oil and refining industry have changed substantially. At present, Russia has 22 large refineries, each with an individual throughput capacity exceed..
Consider accurate feed characterization with improved simulation methods
Assay definition is crucial for accurate process simulations. The performance of process simulators depends on the feed definition to the processing unit. Modern analytical laboratories can offer comp..
Optimize slop-wax bed height in the vacuum unit
The vacuum distillation (VD) unit in the petroleum refinery separates the heavier fraction of crude oil from the atmospheric distillation unit (ADU) into light vacuum gasoil (LVGO) and heavy VGO (HVGO..
HP Construction Profile: US Midwest refinery nears completion of major modernization project
In early July 2013, BP announced that it has completed the commissioning and startup of a new, 250,000-bpd crude distillation unit at the Whiting refinery, marking a major achievement in the multi-bil..
Streamline plant information for brownfield assets
Brownfield assets suffer from handling large volumes of unstructured information. Often, such projects do not have up-to-date/as-maintained 3D models, data warehouses or integrated operation systems, ..
Optimize your compressor maintenance program
One deviation alone might not be enough to bring on a compressor failure, but, when several more deviations combine, the failure risk is known to increase exponentially.
Case history: Failure analysis of a syngas compressor
A first-stage impeller in a synthetic gas compressor failed after 20 years of service. The compressor is a six-stage centrifugal compressor driven by a steam turbine. This case history discusses the i..
Improve pressure drop calculations for saturated water lines
When saturated water flows through pipes and components, it flashes—thus increasing its specific volume and limiting the fluid flowrate. Due to these conditions, the calculation and design for pi..
HP Reliability: Four-stage, low-flow process centrifugal compressor can fill important industry gaps
In the 1970s and 1980s, multistage centrifugal compressors in the 3,000 acfm (about 5,000m3/hr) and lower flow ranges were largely confined to instrument and plant air duties. Three stages with interc..
HP Integration Strategies: Consider procedural automation at a commercial-scale pilot plant
“All processes are batch processes to some degree. Even in ‘continuous’ process plants, processing units will need to be shut down at some point and then restarted to resume production...

- thyssenkrupp Uhde completes pre-FEED for HAMR Energy’s renewable fuels project in Australia 8/21
- Europe distillates-diesel profit margins firm 8/21
- U.S.: Indiana's bp refinery restarts after severe flooding 8/21
- Berlin weighs trusteeship extension for Rosneft's German assets 8/21
- Trump administration to rule on biofuel exemption requests, delay reallocation decision 8/21
- TotalEnergies' Donges refinery fire extinguished 8/21