Environment & Safety Gas Processing/LNG Maintenance & Reliability Petrochemicals Process Control Process Optimization Project Management Refining

Middle East

Dow, Saudi Aramco select Jacobs for engineering, construction of chemicals venture

Jacobs Engineering Group was awarded an engineering, procurement and construction management (EPCM) contract for the Chemicals 1 Envelope of Sadara Chemical Co., the joint venture between Dow Chemical and Saudi Aramco. Construction work on the project has already started and is scheduled to be completed by early 2015.

Fluor wins maintenance deal for RasGas in Qatar

Fluor Corp. announced today that Qatar National Facilities Services (QNFS), a Qatari-based company partly owned by Fluor, signed a five-year comprehensive maintenance services contract with RasGas Co. Ltd.

Spent caustic management: Remediation review

Understanding of waste components needed for proper spent caustic disposal

Tips on communicating LOPA results to management

Mustang Engineers, LP: Shah, G. C.

Communicate clearly and explain thoroughly

Pilot-operated safety relief valves: A simple, effective plant upgrade

GE Energy: Scott, J. R.  |  MacKinnon, N.

Replacing spring-loaded valves can help increase efficiency and output

Relief device inlet piping: Beyond the 3 percent rule

Smith & Burgess LLC: D. Smith
Smith and Burgess LLC: Burgess, J.
Smith and Burgess: Powers, C.

With careful consideration, an engineer can be certain that an installation will not chatter

Safety instrumented function design reduces nuisance trips

Tesoro Corp.: Kern, A.G.

Implementing low-cost best practices can provide peace of mind

Improve material balance in high-purity distillation control

Summa Control Solutions Inc.: Nino, S.

Using dual-composition conserved energy efficiency, reduced reprocessing and allowed higher throughput

Case 65: Taking risks and making high-level presentations

Consulting Engineer: Sofronas, A.

Tips on how to communicate with managers

Investigation: Failure of a steam generator

SABIC R&T: Babakr, A.  |  Bairamov, A.

In case history, engineers search for root cause of water-side tube failures for a 23-year-old boiler