Process Optimization
Use advanced predictive analytics for early detection and warning of column flooding events
In this study, a methodology was implemented to predict crude distillation tower flooding events based on key process variables, including product yields, column pumparound (PA) flowrates, column temperatures and overhead reflux flowrate.
Digital: Maximize return on capital investment with predictive maintenance
Oil and gas professionals are well aware of the pressures companies face in the market.
Supply Chain: Sustainable journey toward global competitiveness—A study
Brahmaputra Cracker and Polymer Ltd. (BCPL) is building the Assam Gas Cracker complex in Lepetkata, India.
Show Preview: IRPC Europe returns to Italy this June
Gulf Energy Information and Hydrocarbon Processing are pleased to provide a preview of IRPC Europe 2018, which will be held June 5–7 in Milan.
Speed up the development of new commercial adsorbents—Part 2
In the conventional development approach, a multi-stage process begins in the laboratory, moves to the pilot plant and then ends at the commercial unit, often before any financial benefits are realized.
Enhancing refinery profitability with a novel offgas conversion technology
The refining industry is challenged every day to optimize product slates that comply with market demand, product specifications, environmental regulations and refining-petrochemical integration, all while remaining profitable.
An optimized approach to choosing solvent for the liquid-liquid extraction process
Liquid-liquid extraction (LLE) is a traditional method used for separating a specific component (solute) from the carrier liquid phase.
Speed up the development of new commercial adsorbents—Part 1
In the conventional development approach, a multi-stage process begins in the laboratory, moves to the pilot plant, and ends at the commercial unit, often before any financial benefits are realized.
Energy losses from the radiant firebox wall of pyrolysis furnaces
The steam cracking unit is highly energy demanding, requiring high-severity pyrolysis furnaces to break the carbon-carbon bonds, as well as high pressure for the purification of its products.
Business Trends: Rejuvenating the contract “spine” of megaprojects—Part 1
Business executives and project managers are grappling with challenging business environments and a 20-yr legacy of failing megaprojects.
- Petrobras delivers LPG sold at steep premiums despite Lula move to annul auction 4/3
- Plug Power to supply 275-MW GenEco electrolyzer system for Hy2gen’s Courant decarbonized ammonium nitrate project 4/3
- Vietnam refinery boosting jet fuel production 4/3
- China plans to upgrade some petrochemical plants, phase out others by 2029 4/3
- Morocco has diesel stocks for 51 days, energy ministry says 4/3
- Nigeria's Seplat Energy hit by strike amid push for higher output 4/3

