Process Optimization
Enterprise chooses Foster Wheeler for engineering on Texas PDH project
Foster Wheeler was awarded an engineering, procurement and construction contract by Enterprise Products for a propane dehydrogenation unit (PDH) and associated power, utilities and infrastructure at Mont Belvieu, Texas. Financial terms of the agreement were not disclosed.
Optimize your compressor maintenance program
One deviation alone might not be enough to bring on a compressor failure, but, when several more deviations combine, the failure risk is known to increase exponentially.
Case history: Failure analysis of a syngas compressor
A first-stage impeller in a synthetic gas compressor failed after 20 years of service. The compressor is a six-stage centrifugal compressor driven by a steam turbine. This case history discusses the i..
Improve pressure drop calculations for saturated water lines
When saturated water flows through pipes and components, it flashes—thus increasing its specific volume and limiting the fluid flowrate. Due to these conditions, the calculation and design for pi..
Achieve uniform heat flux in a coker furnace
A delayed coker unit thermally cracks vacuum residue (VR) and converts it into products like liquefied petroleum gas (LPG), naphtha, gasoil and petroleum coke. A majority of the thermal cracking takes..
HP Reliability: Four-stage, low-flow process centrifugal compressor can fill important industry gaps
In the 1970s and 1980s, multistage centrifugal compressors in the 3,000 acfm (about 5,000m3/hr) and lower flow ranges were largely confined to instrument and plant air duties. Three stages with interc..
HP Integration Strategies: Consider procedural automation at a commercial-scale pilot plant
“All processes are batch processes to some degree. Even in ‘continuous’ process plants, processing units will need to be shut down at some point and then restarted to resume production...
HP Boxscore Construction Analysis: Outlook for major revamp projects—Part 2
Worldwide, refiners are investing billions in upgrading and modernizing projects. These efforts are focused on:Increasing flexibility to process heavier, sourer crudesImproving energy efficiencyMeetin..
HP Engineering Case Histories: Case 74: How to determine impact forces when troubleshooting
When troubleshooting failures, it is not unusual for the metallurgical report to indicate that the failure was the result of an impact type of force. The investigator who receives this information mus..
HP Industry Perspectives: US oil and gas executives energized for the year ahead
A recent survey of US executives by the KPMG Global Energy Institute supports growing optimism in the domestic energy and manufacturing industries. Much of the renewed enthusiasm is strongly linked to..
- YPF, Eni and XRG sign joint development agreement advancing 12-MMtpy Argentina LNG project 2/12
- Maire launches new technology to produce PTMEG, the key polymer composing the spandex fiber. 2/12
- Verde Clean Fuels announces suspension of development of Permian Basin gas-to-gasoline project 2/12
- Vietnam's largest refinery to operate at 120%-125% of designed capacity in Q1 2/12
- Indonesia's Medco expansion plans bet on rising energy demand in Southeast Asia 2/12
- Brazil to rebuild ethanol stocks in new harvest after 21% drop in 2025-2026 2/12

