Process Optimization
KBR wins engineer work on new Cambodia refinery
Under the terms of the contract, KBR said it will provide licensing and basic engineering services for the 1.2 million tpy VCC unit that will process refinery vacuum residues into naphtha and Euro 5 diesel products. CPC is the first refinery in Cambodia, with a crude capacity of 5 million tpy.
KBR to revamp, expand Hungary ammonia plant
As a leading supplier of ammonia process technologies, KBR has been involved in the licensing, design, engineering and/or construction of more than 200 ammonia plants worldwide, representing approximately half of current global ammonia production. Financial terms were not disclosed.
Jacobs wins engineering work for new Reliance cracker complex in India
The engineering work under this contract is for the construction of offsites and utilities facilities, according to Jacobs officials. Officials did not disclose the contract value. The new cracker complex is part of a major expansion of Reliance’s petrochemical capacities at Jamnagar and other sites in India.
Nitrogenmuvek awards work to KBR for revamp of Hungary ammonia plant
As a leading supplier of ammonia process technologies, KBR has been involved in the licensing, design, engineering and/or construction of more than 200 ammonia plants worldwide, representing approximately half of current global ammonia production. Financial terms were not disclosed.
Foster Wheeler acquires US biotech construction firm Yonkers Industries
The 30-year-old, US-based company specializes in the management of construction and commissioning of pharmaceutical and biotech facilities, with capabilities to also manage the full EPCm (engineering, procurement and construction management) of such facilities.
Fluor, JGC win design work for Mozambique LNG
The FEED work will deliver designs for the initial phase of the Mozambique LNG project of four trains, each train capable of producing 5 million tpy of liquefied natural gas (20 million tpy total). The project has the potential to expand its capacity up to approximately 50 million tpy of LNG in the future.
Foster Wheeler expands North American offering of CFB scrubber technology
Although Foster Wheeler has provided this technology globally for more than a year, it was previously offered in North America exclusively through a third party under a licensing arrangement. Foster Wheeler acquired the Graf Wulff CFB scrubber technology due to its flexibility to meet new tightening regulations.
Technip to design Mosaic Louisiana ammonia plant
Mosaic’s preference is to locate the proposed plant adjacent to the company’s existing Faustina fertilizer manufacturing operations in St. James Parish, Louisiana. It would have a capacity of 2,200 tpd.
CB&I, Chiyoda win engineering, design work for Mozambique LNG trains
The FEED will deliver designs for the initial phase of the Mozambique LNG project of four trains each with 5 million tpy of LNG production capacity. This project is the first LNG project in Mozambique, and it has the potential to expand its capacity up to approximately 50 million tpy of LNG in the future.
Optimize LNG boil-off gas systems for regasification terminals
Depending on LNG composition, N2 content and plant operating mode, an operating pressure of 7 barg to 8 barg was found by the study to be the optimum pressure range.
- SkyNRG starts construction on its first SAF plant in Delfzijl, the Netherlands 2/13
- India's Reliance wins U.S. license for Venezuelan oil 2/13
- Singapore light distillates stocks hit over 3-yr high on robust imports 2/13
- Three contractors injured at ExxonMobil facility in Beaumont, Texas (U.S.) 2/13
- China's epic renewables boom lifts it into rare clean capacity club 2/13
- TotalEnergies booked loss in France due to refining activities, CEO says 2/13

