Project Management
Fabrication of clad equipment and piping—Part 2
For pressure vessels, heat exchangers and piping in corrosive services, the materials in contact with the process are often required to be high alloys to provide a reliable service life.
Design considerations for rigging and transportation of large process columns
Design guidelines for rigging and transporting large process columns are outlined in this article, along with the various aspects that should be considered during the initial design phase of equipment.
The top three causes of contractor and engineering misalignment
When contractors, engineers and operations teams at downstream processing plants do not work together at optimal efficiency, it can present serious problems.
How did asset utilization modeling save Sadara $1 B in capital cost?
Sadara is a JV between Saudi Aramco and Dow Chemical.
EPC/construction contracting—Start with the end in mind
Large capital projects continue to be challenged by budget issues.
Reliability: How to deal with time thieves and knowledge parrots
We recently corresponded with an engineer-manager who divides his time between managing a highly productive group of product developers and a growing number of callers that are interested in the innovative solutions his company offers.
Business Trends: The case for teaching competence—Part 2
Readers who have had the misfortune of being drawn into debates over the precise definitions of words or terms might agree that much time can be lost in unproductive squabbling.
Details on high-impact refining and petrochemical projects presently under construction, as chosen by HP editors and readers
The global hydrocarbon processing industry (HPI) continues to expand and modernize to efficiently meet growing demand for energy, transportation fuels and petrochemicals.
Business Trends: The case for teaching competence—Part 1
Readers who have had the misfortune of being drawn into debates over the precise definitions of words or terms might agree that much time can be lost in unproductive squabbling.
Viewpoint: The opportunity for greater growth and value—Considerations for crude-to-chemicals projects
Industry players are focused on upgrading to higher-growth, higher-value chemical products.
- Petrobras delivers LPG sold at steep premiums despite Lula move to annul auction 4/3
- Plug Power to supply 275-MW GenEco electrolyzer system for Hy2gen’s Courant decarbonized ammonium nitrate project 4/3
- Vietnam refinery boosting jet fuel production 4/3
- China plans to upgrade some petrochemical plants, phase out others by 2029 4/3
- Morocco has diesel stocks for 51 days, energy ministry says 4/3
- Nigeria's Seplat Energy hit by strike amid push for higher output 4/3

