Sarwat, A
Adnan Sarwat has more than 25 yr of project and maintenance/turnaround experience in both the downstream and upstream sectors while mainly working in the Middle East with international oil companies. As a mechanical engineer, he has a passion for using his practical experience to train and mentor fellow and young engineers.
Photography in the oil and gas industry: Its significance and best practices
Producing photographs of and within process plants requires special attention and discipline.
Arranging lines in a pipe rack: How to standardize pipe spacing in the oil and gas industry
This article provides deep insight to piping layout engineers, presenting a holistic/systematic approach for pipe spacing based on different pipe supports—e.g., rest, guide, shoe and clamps (rather than assuming spacing based on 50-mm or 75-mm clearance between pipes).
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Chevron Phillips Chemical completes low-viscosity PAO expansion in Belgium 8/12
- AFPM: U.S. RFS proposal misses the mark on affordability, security by an ‘Iowa mile’ 8/12
- Sasol expects profit rebound on higher chemical prices and lower impairments 8/12
- Indonesia's Pertamina delivers first used cooking oil aviation fuel 8/12
- India's HMEL plans to shut refinery for 40-day maintenance, sources say 8/12
- Indian refiners using term deals as hedge against Russian supply risk 8/12
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction