Sarwat, A
Adnan Sarwat has more than 25 yr of project and maintenance/turnaround experience in both the downstream and upstream sectors while mainly working in the Middle East with international oil companies. As a mechanical engineer, he has a passion for using his practical experience to train and mentor fellow and young engineers.
Photography in the oil and gas industry: Its significance and best practices
Producing photographs of and within process plants requires special attention and discipline.
Arranging lines in a pipe rack: How to standardize pipe spacing in the oil and gas industry
This article provides deep insight to piping layout engineers, presenting a holistic/systematic approach for pipe spacing based on different pipe supports—e.g., rest, guide, shoe and clamps (rather than assuming spacing based on 50-mm or 75-mm clearance between pipes).
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Phillips 66 greenlights new gas plant and fractionator projects, advancing integrated wellhead-to-market strategy 5/18
- OXEA and Air Liquide renew syngas and hydrogen supply agreement for Oberhausen site 5/18
- Commonwealth LNG gets green light to start construction of $13-B, 9.5-MMtpy LNG terminal 5/15
- ARENA to drive Australia's $1.1-B Cleaner Fuels Program 5/15
- Japan’s first green ammonia plant based on KBR’s K-GreeN process now fully operational 5/15
- Repsol's Chairman asserts the role of refining as a strategic industry for Spain and for Europe 5/15
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

