Environment & Safety Gas Processing/LNG Maintenance & Reliability Petrochemicals Process Control Process Optimization Project Management Refining

Asia/Pacific

Pre-engineered solutions drive down advanced control costs

Emerson Process Management: Sharpe, P.  |  Hawkins, G.

Process control can improve quality and operating efficiency

Reevaluate the activity of your catalyst system

Bharat Petroleum Corp. Ltd.: Choudary, N. V.  |  Gokak, D. T.  |  Ravichander, N.  |  Voolapalli, R. K.
Bharat Petroleum Corp., Ltd.: Siddiqui, M. A.  |  Chiranjeevi, T.

Selecting optimum conditions for fluid catalytic cracking requires micro activity testing through an improved method

Limit the damage from a vapor cloud loss

Allianz Global Corporate & Specialty Energy: Allen, G.

Risk reduction ideas from personal experience

HP Reliability: Reliability pros: Hear what others say about you

Hydrocarbon Processing Staff: Bloch, Heinz P.

In an editorial “Engineering Better Engineers,” published in the January 2010 issue of Civil Engineering News, John Bachner commented on how lack of innovation has resulted in engineering se..

HP Water Management: Be a saavy buyer of water treatment chemicals

MarTech Systems, Inc.: Huchler, L. A.

Suppliers for water treatment chemicals are a critical part of managing the reliability of utility water assets. In the petrochemical industry, the water treatment supplier provides chemical additives..

HP Integration Strategies: Standard-based interoperability is key for terminal automation systems

ARC Advisory Group: Miller, Paul

The highly complex, dynamic and multi-faceted operational nature of tank farms and petroleum product terminals, combined with the environmental and price sensitivity of the products being handled, req..

HP Construction: Asia-Pacific

Hydrocarbon Processing Staff: Meche, Helen

SKC Co., Ltd. and Uhde Inventa-Fischer have a contract for the supply of a plant for producing high-quality polyethylene terephthalate (PET) for the manufacture of films in Jincheon, Republic of Korea..

HP Construction: Construction begins for Shell FLNG facility in Australia

Hydrocarbon Processing Staff: DuBose, Ben

Prelude gas field project is progressing at rapid pace, with first LNG production expected by 2017

Koppers to supply liquid carbon pitch for Rio Tinto smelters in Australia

Koppers Holdings and Rio Tinto Aluminium have agreed to a 42-month contract extension that began on January 1, 2011, and continues through June 30, 2014. Under the terms of the agreement, Koppers will supply and transport liquid carbon pitch to Rio Tinto smelters in Australia at an estimated value in excess of $100 million.

KBR wins technology, process design deal on China coal-based ammonia plant

KBR was awarded a contract by China National Coal Group Corp. to provide ammonia technology, process design package and technical services for two 1,660 tpd ammonia synloop units at a complex in Tuke Industrial Park, Erdos, Inner Mongolia, China.