Environment & Safety Gas Processing/LNG Maintenance & Reliability Petrochemicals Process Control Process Optimization Project Management Refining

Engineering & Design

HP Reliability: Gain more flexibility with special liners for reciprocating compressor cylinders

Hydrocarbon Processing Staff: Bloch, Heinz P.

By changing only the crank-end head, piston and rod assembly, the same cylinder body can be mounted on any of the common 5-in. to 7-in. stroke compressor frames that have been manufactured in the last five decades.

HP Boxscore Construction Analysis: India’s refining capacity expands to satisfy surging demand

Hydrocarbon Processing Staff: Nichols, Lee

Both public and private refiners are planning or have already commenced major expansion and upgrade projects, with several working to develop new grassroots facilities.

HP Viewpoint: Brief overview of India’s upstream

Cairn India Ltd.: Nair, S.V.

Over the last few decades, the Indian upstream sector has evolved through three different regulatory regimes—nomination, pre-new exploration licensing policy (NELP)/limited bid rounds and, finall..

HP Automation Safety: Maintenance capability: Does it matter in the long term?

exida LLC: Goble, W.

I remember working in a test department, where a particular technician, known as Mike, seemed to destroy a significant percentage of the equipment he worked on. Since he reported to me, I tried extra ..

HP Industry Perspectives: Marine fuels: Not clear sailing ahead

Hydrocarbon Processing Staff: Romanow, Stephany

Major changes are unfolding that will impact the marine shipping industry. Within the next decade, tighter environmental rules will be in place, changing fuels used to propel international and domesti..

India’s thirst for energy to be addressed at IRPC

Hydrocarbon Processing Staff: Thinnes, Billy

International Refining and Petrochemical Conference (IRPC) 2013New Delhi is an international city with numerous attractions. It is the home of the Qutub Minar, the tallest minaret in India. The c..

Technip wins work for UAE coke calcination project

This new unit is part of the carbon black and delayed coker project being implemented adjacent to Takreer’s existing Ruwais refinery located in the United Arab Emirates. The unit will consist of two trains and is designed to process 700,000 tpy of superior-quality anode green petroleum coke.

Linde Group to build large Russian ammonia plant

Linde's engineering division will construct the new plant, designed to deliver exceptional levels of energy efficiency, according to project officials. The plant will have a production capacity of 1,340 tpd of ammonia. Construction work is scheduled for completion in 2016.

Petronas, Japex pick engineering contractors for Canada LNG export project

The contractors are Bechtel, a joint venture comprised of KBR and JGC Corp., and the Technip/Samsung Engineering/China Huanqiu joint venture. The awards represent an important step towards Pacific NorthWest LNG designing and constructing a world-class LNG export facility in British Columbia.

Bechtel to open UAE engineering solutions hub

HP Editorial Staff: HP News

Bechtel officials say the new center, to be located in the UAE, will allow them to provide customers with innovative engineering solutions more efficiently and cost effectively.