Jacobs wins engineering work for new Reliance cracker complex in India

The engineering work under this contract is for the construction of offsites and utilities facilities, according to Jacobs officials. Officials did not disclose the contract value. The new cracker complex is part of a major expansion of Reliance’s petrochemical capacities at Jamnagar and other sites in India.

Nitrogenmuvek awards work to KBR for revamp of Hungary ammonia plant

As a leading supplier of ammonia process technologies, KBR has been involved in the licensing, design, engineering and/or construction of more than 200 ammonia plants worldwide, representing approximately half of current global ammonia production. Financial terms were not disclosed.

Foster Wheeler acquires US biotech construction firm Yonkers Industries

The 30-year-old, US-based company specializes in the management of construction and commissioning of pharmaceutical and biotech facilities, with capabilities to also manage the full EPCm (engineering, procurement and construction management) of such facilities.

Fluor, JGC win design work for Mozambique LNG

The FEED work will deliver designs for the initial phase of the Mozambique LNG project of four trains, each train capable of producing 5 million tpy of liquefied natural gas (20 million tpy total). The project has the potential to expand its capacity up to approximately 50 million tpy of LNG in the future.

Technip to design Mosaic Louisiana ammonia plant

Mosaic’s preference is to locate the proposed plant adjacent to the company’s existing Faustina fertilizer manufacturing operations in St. James Parish, Louisiana. It would have a capacity of 2,200 tpd.

CB&I, Chiyoda win engineering, design work for Mozambique LNG trains

The FEED will deliver designs for the initial phase of the Mozambique LNG project of four trains each with 5 million tpy of LNG production capacity. This project is the first LNG project in Mozambique, and it has the potential to expand its capacity up to approximately 50 million tpy of LNG in the future.

Optimize LNG boil-off gas systems for regasification terminals

Ranhill WorleyParsons: Zolfkhani, M.

Depending on LNG composition, N2 content and plant operating mode, an operating pressure of 7 barg to 8 barg was found by the study to be the optimum pressure range.

Improve evaluation of brittle-fracture resistance for vessels

Becht Engineering Co. Inc.: Sims, J. R.

This article discusses a new approach and spreadsheet tool for engineers that can be used to provide operating pressure limits as a function of vessel-metal temperatures.

Evaluate pressure relief system forces in existing installations

Smith & Burgess LLC: D. Smith  |  White, J.
Frenk Water Technologies LLC: Frenk, B.

The purpose of this study is to limit the number of relief valves that require rigorous engineering calculations to determine the adequacy of the installation.

Improve your plantwide steam network

Merrick & Co.: Pelham, R. O.

When optimizing an existing steam network, design and process engineers need a complete understanding of all aspects of the existing system. Accurate energy and material balances must be established.