Maintenance & Reliability
Industry Perspectives: The evolution of the downstream
In Hydrocarbon Processing’s April issue, the editorial comment focused on advancing ideas in the downstream processing industries.
Power: Temporary power tips for turnarounds and maintenance activities
Maintenance activities and turnarounds often prove challenging to a facility’s electrical power system.
Executive Viewpoint: A vision for the refinery of 2030
The refining business needs to change dramatically over the next decade.
Editorial Comment: Sustainability: The latest creation in advancing ideas
Over the past few months, Hydrocarbon Processing’s editorial staff has traveled thousands of miles to attend numerous conferences, events, users’ groups, groundbreakings, etc.
Applying industry standards to address cybersecurity risk
Cybersecurity standards and related practices contain valuable information for both asset owners and solution suppliers.
Coke drum and blowdown system overpressure protection design—Part 2
The blowdown (BD) system in delayed coking units (DCUs) receives waste streams generated during the coke drum (CD) decoking process to recover valuable hydrocarbons and water.
Digital: Cloud-based dynamic simulation models amplify operator training and safety programs
International oil and gas (O&G) and hydrocarbon processing industry (HPI) companies are under great pressure to be profitable.
Reliability: Safe fluid machines are our responsibility
Early in our training as engineers, we developed the ability to collect and evaluate data.
Editorial Comment: Where some see roadblocks, we see opportunities
In the January issue of Hydrocarbon Processing, the editorial comment focused on the roadmap to advancing ideas.
Coke drum and blowdown system overpressure protection design - Part 1
The blowdown (BD) system in delayed coking units (DCUs) receives waste streams generated during the coke drum (CD) decoking process to recover valuable hydrocarbons and water. In recent DCU designs, the CD pressure relief valves (PRVs) also discharge to this system and then to the flare system via the BD PRVs.
- OXEA confirms final investment decision for major capacity expansion at plant 7/10
- TotalEnergies ships to Asia the first cargo produced by the ECA LNG plant 7/10
- ADNOC L&S expands LNG fleet with order for four new carriers 7/10
- India's ONGC plans to build 13-MMbbl national strategic oil reserve 7/10
- Russian refineries, oil terminal, tankers hit, Ukraine says 7/10
- Tajikistan says it has 60 days' fuel in reserve amid Russian supply crunch 7/10

