Process Optimization
Applying industry standards to address cybersecurity risk
Cybersecurity standards and related practices contain valuable information for both asset owners and solution suppliers.
Coke drum and blowdown system overpressure protection design—Part 2
The blowdown (BD) system in delayed coking units (DCUs) receives waste streams generated during the coke drum (CD) decoking process to recover valuable hydrocarbons and water.
Digital: Cloud-based dynamic simulation models amplify operator training and safety programs
International oil and gas (O&G) and hydrocarbon processing industry (HPI) companies are under great pressure to be profitable.
Editorial Comment: Where some see roadblocks, we see opportunities
In the January issue of Hydrocarbon Processing, the editorial comment focused on the roadmap to advancing ideas.
Business Trends: How plastics waste recycling could transform the chemical industry
If plastics demand follows its current trajectory, global plastics-waste volumes would grow from 260 MMtpy in 2016 to 460 MMtpy by 2030, taking what is already a serious environmental problem to a new level.
Selection of cooling water system for gas, petroleum and petrochemical plants located on coastline - Part 1
Cooling water systems play an important role in today’s industry.
Improve CCR reforming profitability using a novel high-density catalyst
Catalytic reforming has been a staple in petroleum refining since 1949.
Solve gravity separation challenges
Separation of oil, water, gas and solids (sand) droplets/particles is one of the most common requirements in most oil and gas facilities.
Develop reactor internals for optimizing reactor design - Part 2: High-performance mixing chamber
Most hydroprocessing reactors are fixed-bed reactors comprising several catalyst beds that are divided by quench zones containing mixing chambers that introduce a vapor-quenching medium.
Coke drum and blowdown system overpressure protection design - Part 1
The blowdown (BD) system in delayed coking units (DCUs) receives waste streams generated during the coke drum (CD) decoking process to recover valuable hydrocarbons and water. In recent DCU designs, the CD pressure relief valves (PRVs) also discharge to this system and then to the flare system via the BD PRVs.
- GTT receives order from Samsung Heavy Industries for the tank design of two new very large ethane carriers 2/11
- Emerson introduces hybrid continuous gas analyzer for improved regulatory compliance and emissions control 2/11
- BASF to further strengthen Global Business Services through global hub setup 2/11
- Morocco signs agreement with ORNX consortium for $4.5-B green ammonia complex 2/11
- Rosneft oil refinery in Germany warns of risks from U.S. sanctions 2/11
- TotalEnergies takes over Zeeland refinery operations, Lukoil still owns 45% 2/11

