Construction
HP Engineering Case Histories: Case 79: Integral compressor failures
Recently, the author received information regarding the failure of a large reciprocating compressor. In this example, the pistons for power and compressor cylinders are powered by the same crankshaft...
HP Viewpoint: Transformation of downstream automation and information systems
One of the more interesting aspects about working in the energy sector, as I have done for the last 36 years, is that this industry is always changing—technically, economically and even political..
HP Industry Perspectives: Is the glass half full or half empty?
This year is nearly half over; however, the energy industry is more optimistic about the market and economy according to Ernst & Young’s (EY’s) recent 10th biannual Oil and Gas Capital Confi..
HP Industry Metrics
The total liquid supply growth by non-OPEC countries continues to rise and is estimated to reach 54 million bpd (MMbpd) in 2014. Increasing crude oil supplies from North America are contributing to sh..
US energy production means new jobs. Are we ready?
At the beginning of this now-not-so-new millennium, the US was faced with great tragedy, a loss of security and uncertainty in the future. Today, the nation has rebounded, thanks to a robust energy se..
Skills shortages in a booming market: The big oil and gas challenge
The strains on labor capacity in oil and gas construction markets worldwide are becoming increasingly well known. These strains continue to affect forecasted project costs, and several large capital p..
Evaluate piping for displacement-controlled loading
In a Canadian case study, new piping under construction suffered some settlement in the underground portion, as evidenced by soil movement and slight deflection of the above-ground section.
HP Project Management: Better strategies avoid project delays—Part 2
How can project managers avoid project schedule overruns? Part 1 discussed how to analyze the root causes for project delays. In Part 2, strategies to overcome project delays will be explored.Critical..
HP Global: Russian executives to build country’s first waste oil refinery
The 4-MMtpy Kirishi-2 refinery is anticipated to cost $3.14 B to construct. Plans call for the refinery to be expanded to a capacity of 12 MMtpy at a later date, at an additional cost of $5 B–$7 B.
Improve the cracking of ethylene dichloride
The discovery and exploitation of shale gas in North America is providing a boost to the domestic petrochemical industry. In particular, commodity petrochemicals such as polyvinyl chloride (PVC) are e..

- thyssenkrupp Uhde completes pre-FEED for HAMR Energy’s renewable fuels project in Australia 8/21
- Europe distillates-diesel profit margins firm 8/21
- U.S.: Indiana's bp refinery restarts after severe flooding 8/21
- Berlin weighs trusteeship extension for Rosneft's German assets 8/21
- Trump administration to rule on biofuel exemption requests, delay reallocation decision 8/21
- TotalEnergies' Donges refinery fire extinguished 8/21