Environment & Safety Gas Processing/LNG Maintenance & Reliability Petrochemicals Process Control Process Optimization Project Management Refining

Gasoline

Clean fuels: What are the issues?

KBC Advanced Technologies, Inc.: Ohmes, R.  |  Sayles, S.

Critical hurdles such as testing and supply distribution must be resolved as part of new fuel mandates

It’s not too soon to prepare for new EU chemicals legislation

CONCAWE: Dmytrasz, B. A.

Regulation in Europe is on the verge of a radical transformation. What does this mean for the downstream oil industry?

Consider using new technology to improve FCC unit reliability

Shell Global Solutions International BV: Dries, I. H.  |  Muller, F.  |  Willbourne, P.
Shell Eastern Petroleum Pte Ltd.: Fum, M.
Shell Global Solutions: Williams, C. P.

In this revamp project, installing new equipment increased throughput with the added bonus of greater mechanical integrity for the unit

New mild hydrocracking route produces 10-ppm-sulfur diesel

Tightened specifications challenge refiners to develop innovative solutions that upgrade heavy cuts into high-quality diesel

What are the options for hydrogen plant revamps?

Process Development Dept., Technology Division, Haldor Topsoe A/S: Dykbkjaer, I.

Increase existing production capacity using these novel technologies

Upgrade catalytic cracking operations

SINOPEC Research Institute of Petroleum Processing (RIPP): He, M.-P.  |  Long, J.  |  Tian, H.-P.

New processing methods fine-tune gasoline for the Chinese market

Improve catalytic cracking to produce clean fuels

The Shaw Group: Letzsch, W.

Update the cracker heat balance to minimize coke make

Avoid retrofit pitfalls through improved FEED

Parsons International Ltd.: Eskaros, M.

Incomplete front-end engineering efforts can be costly oversights and contribute to project overruns and missed goals

Case history: Fawley FCCU olefins project

Foster Wheeler Energy Ltd.: Payne, J. B.
HP Editorial Staff: Roberts, M. T.
ExxonMobil Engineering Europe Ltd.: Thomas, C. N.

Careful planning enabled the delivery, construction and installation of a replacement 860-ton reactor within a 64-day turnaround

Review fundamentals when retrofitting for ULSD

Mustang Engineering Inc.: Johnson, J. W.  |  Palmer, R. E.

The success of revamps is driven by accurate front-end process design. Performing feasibility studies controls cost estimates and ensures meeting goals for upgrades